The Baldwin Planning Board will hold a public hearing regarding Nature's Wilderness, LLC, which operates the Nature's Wilderness Resort in Baldwin, Maine. The purpose of this hearing is for the Board to determine whether there has been a violation of the conditional use permit and/or local, state, or federal laws including, but not limited to
operating a campground since July 1, 2020 without a required state-issued campground license (and possibly without other required licenses or permit)
allowing ATV's to encroach on adjacent property
failure to post required signage
operation a non-compliance swimming pool
failure to conduct required water testing; and
failure to submit required documentation to the Town
If the Board determines that any violation of the conditional use permit and/or local, state, or federal laws has occurs, and is either continuing or is likely to reoccur, the Board may take such appropriate action to protect the public health, safety, or welfare.
Nature's Wilderness, LLC's conditional use permit, and other important info can be found here.
*Face coverings will be required at the meeting.
Comentários